ORALS
SESSION: EnvironmentalWedPM1-R7
| 7th Intl. Symp. on Environmental, Policy, Management , Health, Economic , Financial, Social Issues Related to Technology and Scientific Innovation |
Wed Nov, 7 2018 / Room: Pontal (50/2nd) | |
Session Chairs: Xin Hu; Heap-Yih Chong; Session Monitor: TBA |
14:00: [EnvironmentalWedPM105]
A Novel Multi-agent Conceptual Framework for Stakeholder Management in Infrastructure Projects Heap-yih
Chong1 ;
Xin
Hu2 ; Xiangyu
Wang
2 ;
1Curtin University, Cannington, Australia;
2Curtin University, Perth, Australia;
Paper Id: 28
[Abstract] Off-site manufacturing (OSM) has been confirmed as an efficient production approach in the construction industry, benefiting the industry stakeholders in many ways, such as the improved sustainability and productivity [1]. A variety of stakeholders are involved into the development of an OSM project [2], and the successful project implementation requires a highly integrated level of collaboration among the stakeholders [3]. However, limited studies are available to explore this important issue. Therefore, this discussion paper aims to develop a novel multi-agent conceptual framework to facilitate the management of OSM stakeholders. An integrative review method was adopted to achieve the aim. The proposed framework will enrich the current understanding of stakeholder management in OSM projects and promote a new collaborative working platform in a large scale social environment. It also promotes the establishment of the theoretical foundation of collaborative planning in infrastructure projects.
References:
[1] Pan W, Gibb AG, Dainty AR. 2012. Strategies for Integrating The Use of Off-site
Production Technologies in House Building. Volume 138. Journal of Construction
Engineering and Management. p. 1331-1340.
[2] Boyd N, Khalfan MM, Maqsood T. 2012. Off-site Construction of Apartment Buildings.
Volume 19. Journal of Architectural Engineering. p. 51-57.
[3] Teng Y, Mao C, Liu G, Wang X. 2017. Analysis of Stakeholder Relationships in The
Industry Chain of Industrialized Building in China. Volume 152. Journal of Cleaner
Production. p. 387-398.
[4] London K, Pablo Z. 2017. An Actor-network Theory Approach to Developing An
Expanded Conceptualization of Collaboration in Industrialized Building Housing
Construction. Volume 35. Construction Management and Economics. p. 553-577.
[5] Blismas N, Wakefield R. 2009. Drivers, Constraints and The Future of Offsite
Manufacture in Australia. Volume 9. Construction Innovation, p. 72-83.
[6] Arif M, Goulding J, Rahimian FP. 2012. Promoting Off-site Construction: Future
Challenges and Opportunities. Volume 18. Journal of Architectural Engineering, p. 75-78
[7] Torraco RJ. 2005. Writing Integrative Literature Reviews: Guidelines and Examples.
Volume 4. Human Resource Development Review. p. 356-367.
[8] Mullens MA, Armacost RL, Swart WW. 1995. The Role of Object Oriented CAD in A
Generic Simulator for The Industrialized Housing Industry. Volume 4. Automation in
Construction. p. 29-43.
[9] Doran D, Giannakis M. 2011. An Examination of A Modular Supply Chain: A
Construction Sector Perspective. Volume 16. Supply Chain Management: An
International Journal. p. 260-270.
[10] Wood DJ, Gray B. 1991. Toward A Comprehensive Theory of Collaboration. Volume
27. The Journal of Applied Behavioral Science. p. 139-162.
[11] Bildsten L. 2014. Buyer-supplier Relationships in Industrialized Building. Volume 32.
Construction Management and Economics. p. 146-159.
[12] Abanda FH, Tah JHM, Cheung FKT. 2017. BIM in Off-site Manufacturing for Buildings.
Volume 14. Journal of Building Engineering. p. 89-102.
[13] Lee CY, Chong HY, Liao PC, Wang X. 2017. Critical Review of Social Network
Analysis Applications in Complex Project Management. Volume 34. Journal of
Management in Engineering, p. 1-15.
[14] Hughes D, Williams T, Ren Z. 2012. Differing Perspectives on Collaboration in
Construction. Volume 12. Construction Innovation. p. 355-368
SESSION: EnvironmentalWedPM1-R7
| 7th Intl. Symp. on Environmental, Policy, Management , Health, Economic , Financial, Social Issues Related to Technology and Scientific Innovation |
Wed Nov, 7 2018 / Room: Pontal (50/2nd) | |
Session Chairs: Xin Hu; Heap-Yih Chong; Session Monitor: TBA |
14:25: [EnvironmentalWedPM106]
A Transformative Supply Chain Conceptual Framework for Infrastructure Projects Xin
Hu1 ;
Heap-yih
Chong2 ; Xiangyu
Wang
1 ;
1Curtin University, Perth, Australia;
2Curtin University, Cannington, Australia;
Paper Id: 29
[Abstract] Off-site manufacturing (OSM) has proven to be an innovative and effective approach of addressing low productivity and sustainability issues in construction projects [1]. Supply chain management is an indispensable component of the OSM project management [2]. Nevertheless, issues have emerged in the supply chain management while using it in infrastructure projects due to their transient, fragmented, and complex nature as well as the large number of stakeholders involved [3]. The development of a collaborative supply chain has significant values in addressing the issues in the OSM supply chain management for infrastructure projects. However, limited explorations about this issue are available. Therefore, this discussion paper aims to develop transformative supply chain conceptual framework for improving the efficiency and effectiveness of OSM infrastructure projects. An integrative review method was adopted to achieve the aim. The proposed framework will improve the productivity and sustainability performance of the infrastructure sector through advancing supply chain management performance with other advanced technologies. It contributes to the creation of new knowledge of supply chain management in infrastructure engineering.
References:
[1] Department of Infrastructure and Regional Development and Cities. 2017. Australian Infr
astructure Statistics Yearbook 2017. https://bitre.gov.au/publications/2017/files/yearbook
_2017.pdf
[2] Department of Infrastructure and Regional Development and Cities. 2018. Infrastructure I
nvestment Program. http://investment.infrastructure.gov.au/
[3] Infrastructure Australia. 2016. Australian Infrastructure Plan. http://infrastructureaustralia
.gov.au/policy-publications/publications/files/Australian_Infrastructure_Plan.pdf
[4] Blismas N, Pasquire C, Gibb A. 2006. Benefit Evaluation for Off-site Production in
Construction. Volume 24. Construction Management and Economics. p. 121-130.
[5] Wang T, Wang J, Wu P, Wang J, He Q, Wang, X. 2018. Estimating the Environmental
Costs and Benefits of Demolition Waste Using Life Cycle Assessment and Willingnessto-pay:
A Case Study in Shenzhen. Volume 172. Journal of Cleaner Production. p. 14-26.
[6] Abanda FH, Tah JHM, Cheung FKT. 2017. BIM in Off-site Manufacturing for Buildings.
Volume 14. Journal of Building Engineering. p. 89-102.
[7] Zhu J, Wright G, Wang J, Wang X. 2018. A Critical Review of the Integration of
Geographic Information System and Building Information Modelling at the Data Level,
Volume 7. International Journal of Geo-Information. p. 1-16.
[8] Simatupang TM, Sridharan R. 2002. The Collaborative Supply Chain. Volume 13. The
international Journal of Logistics Management. p. 15-30.
[9] Torraco RJ. 2005. Writing Integrative Literature Reviews: Guidelines and Examples.
Volume 4. Human Resource Development Review. p. 356-367.
[10] Shuck B. 2011. Four Emerging Perspectives of Employee Engagement: An Integrative
Literature Review. Volume 10. Human Resource Development Review. p. 304-328.
[11] Downe-Wamboldt B. 1992. Content Analysis: Method, Applications, and Issues. Volume
13. Health Care for Women International. p. 313-321.
[12] El-Abbasy MS, Zayed T, Ahmed M, Alzraiee H, Abouhamad M. 2013. Contractor
Selection Model for Highway Projects Using Integrated Simulation and Analytic
Network Process. Volume 139. Journal of Construction Engineering and Management. p.
755-767.
[13] Li X, Yi W, Chi HL, Wang X, Chan APC. 2018. A Critical Review of Virtual and
Augmented Reality (VR/AR) Applications in Construction Safety. Volume 86.
Automation in Construction. p. 150-162
[14] Song Y, Tan Y, Song Y, Wu P, Cheng JCP, Kim MJ, Wang X. 2018. Spatial and
Temporal Variations of Spatial Population Accessibility to Public Hospitals: A Case
Study of Rural-urban Comparison. GIScience & Remote Sensing. p. 1-27.
[15] Tao S, Wu C, Sheng Z, Wang X. 2018. Space-Time Repetitive Project Scheduling
Considering Location and Congestion. Volume 32. Journal of Computing in Civil
Engineering. p. 04018017.
[16] Gu N, London K. 2010. Understanding and Facilitating BIM Adoption in the AEC
Industry. Volume 19. Automation in Construction. p. 988-999.
[17] Lee CY, Chong HY, Liao PC, Wang X. 2018. Critical Review of Social Network
Analysis Applications in Complex Project Management. Volume 34. Journal of
Management in Engineering. p. 04018017.
[18] Alam Q, Kabir MH, Chaudhri V. 2014. Managing Infrastructure Projects in Australia: A
Shift from a Contractual to a Collaborative Public Management Strategy. Volume 46.
Administration & Society. p. 422-449.
[19] Corsten D, Kumar N. 2005. Do Suppliers Benefit from Collaborative Relationships with
Large Retailers? An Empirical Investigation of Efficient Consumer Response Adoption.
Volume 69. Journal of Marketing. p. 80-94.
[20] Lumineau F, Henderson JE. 2012. The Influence of Relational Experience and
Contractual Governance on the Negotiation Strategy in Buyer-supplier Disputes. Volume
30. Journal of Operations Management. p. 382-395.
[21] Matopoulos A, Vlachopoulou M, Manthou V, Manos B. 2007. A Conceptual Framework
for Supply Chain Collaboration: Empirical Evidence from the Agri-food Industry.
Volume 12. Supply Chain Management: An International Journal. p. 177-186.